Get the tool out of the AI
and onto your computer.
You already make spreadsheets, forms, graphs, and timelines on your machine. When ChatGPT, Claude, or Gemini builds one, the chat will not let you keep it. Paste it into KIT Apps. It runs on your computer. No coding.
Forms·Spreadsheets·Timelines·Graphs
One click to download. Install and you're done.

Quick start
From chat to app in four steps.
First, download KIT Apps (free, about a minute to install). Then, every time:
Ask your AI
Get ChatGPT, Claude, or Gemini to build you a tool: a dashboard, a calculator, a funnel, whatever you need.
Copy the result
Just copy what it gives you. You don't need to know what kind of code it is.
Paste it into KIT Apps
It runs instantly, live and clickable. No setup, nothing else to install.
Keep it or ship it
Save it, share it as one file, or turn it into a real desktop app that opens straight to your tool.
No code knowledge needed. See it in action ▸
Made something in ChatGPT Canvas, Gemini Canvas, or Claude Artifacts?
That's exactly what KIT Apps is for. The interactive thing your AI built, the form, the dashboard, the calculator, the prototype, only really lives inside the chat. KIT Apps runs it for real, lets you keep it, and turns it into an app you can share or install.
You don't need to be a developer. If your AI built something that works, KIT Apps runs it.
Built for founders, operators, analysts, and consultants, not for engineers. Developers are welcome too; it's the fastest way to run a snippet.
Is this me?
If you have to show the real thing.
Turn a fragile spreadsheet into a clean, shareable calculator or interactive tool, a mortgage or pricing calculator or a budget planner, without the formulas only you understand.
See your numbers move: a live dashboard, a cash-flow forecast, a what-if model you can actually click through, not a static screenshot.
Hand a client or your boss an interactive report or proposal they can explore, instead of a flat PDF or slide.
Put a calculator or quiz in front of prospects, an ROI estimator or a “which plan fits you” picker, to qualify leads or make a pitch land.
Build a quick prototype of an app, page, or feature to show a client, your team, or an investor before anyone writes real code.
Make a one-pager or infographic with live, interactive content, charts and toggles that respond, not a flat image.
Teach a concept with an interactive lesson or quiz students can play with, far better than a slide or worksheet.
Present with a live demo instead of a dead slide: drop an interactive chart or model into your talk and let the audience see it respond.
Your AI built something that works. It's trapped in the chat.
It clearly runs, but the chat won't let you use it. Your only options are a screenshot, or handing it to a developer and waiting. KIT Apps is the way out: run it, keep it, share it, and turn the best ones into a real app you can install.
How it works
Run it, then turn it into an app.
Run what you paste
Paste or open
Paste the code straight from your AI assistant. Got a file instead? You can open one.
It just works
KIT Apps loads everything your tool needs automatically. Nothing else for you to install or configure.
See it run
Your tool appears live and clickable. Export a clean PNG or PDF any time you need to share a picture of it.
Keep it
Save it to a library on your machine that survives across sessions. Rename, duplicate, organise.
Turn it into an app
Open something you saved
Pick any tool from your library to turn into an app.
Give it a name and icon
A quick check catches problems before you build.
Build the app
You get a real desktop installer in seconds. It opens straight to your tool, nothing else.
Paste whatever your AI gives you, KIT Apps figures out what it is. You also get: export to PNG or PDF, share as one file, and turn it into a desktop app.
For builders who have to show the real thing.
Founders, operators, analysts, consultants, and finance or ops people who generate working tools with AI and don't want to become developers. The kinds of things they get out of the chat:
Plans
Three tiers. One honest rule.
What runs on your own machine stays in Personal. Paid tiers only ever cover things that genuinely need a server. Personal is free. Pro is NOK 20 per week or NOK 728 per year, with a 14-day free trial. See pricing.
Personal
Available todayEverything that runs on your own machine. Local-first, no account.
- Run anything you paste
- Save and organise a library
- Export to PNG and PDF
- Share self-contained files
- Package real desktop apps
- Team data over a shared folder
Pro
Available, from NOK 20 per weekClean, unbranded output for a weekly fee.
- Everything in Personal
- No watermark on exports and shares
- Standalone apps open without the splash
- Turn usage analytics off
Team
PlannedFor small teams that build and maintain tools together.
- Everything in Pro
- Shared team libraries
- Comments on your tools
- Roles and permissions
Output carries a small "Made with KIT Apps" mark, removable at no cost. No third-party ads, no tracking. Questions about plans? Contact us.
Install
On your machine in a minute.
One click to download. Install and you're done.
Free. Windows only. Pricing
Questions
The honest answers.
No. If your AI assistant built something that works, paste it in and KIT Apps runs it. It is built for people who aren't developers. Developers are welcome too; it's the fastest way to run a snippet.
Whatever your AI gives you. KIT Apps works out what it is and runs it, whether it's an interactive tool or a full page. There are technical specifics in the “For developers” section below.
On your machine. No account, nothing hosted, no extra software. Your tools save to a library that survives across sessions.
Send a single self-contained file the other person opens in KIT Apps, or export a clean PNG or PDF. You can also turn it into a desktop app they install. It is not a web link that opens in any browser.
A tool can calculate and display, and a packaged app can save its own data on your machine and share it across a small team over a shared folder. It does not run a database or collect submissions on its own.
A real desktop installer that opens directly to your one tool, with its own name and icon. No editor, no library, just the app.
Windows only.
Out of the chat.
Onto your computer.
Download KIT Apps. Paste the form, spreadsheet, graph, or timeline the AI made. It runs on your machine and stays there.
One click to download. Install and you're done.
Free · Windows only · Pricing
From the team behind KIT Apps
One focused tool per job.
Built by the same people, to the same standard. Nothing else in the way.
BAS Trustdesk
For leaders
Leaders who need more than a status update. Strategy scored against the work in GitHub, Azure DevOps, and Asana. Read-only by design.
See TrustdeskNET Backup Vault
For network teams
Network teams who need last week's config back. Encrypted, versioned Meraki backup. Roll a bad change back in minutes.
See NET Backup Vault